| 作者 | 河边贤一(东京科学大学)、横山明彦(教职研究员) |
|---|---|
| 发表日期/编号 | 2026年10月 26-J-041 |
| 研究课题 | 电力市场制度设计及其对日本的启示 |
| 下载/链接 |
概要
As renewable energy penetration increases, the risk is expected to increase that reserves procured at the day-ahead stage may not be fully available when needed because of transmission congestion. Changes in renewable energy output forecasts after operational plans are established can affect transmission flows through reserve activation, with impacts depending on the location and direction of forecast errors and generator operating conditions. This paper examines how renewable energy forecast errors cause transmission congestion and introduces methods for identifying congestion-causing scenarios and evaluating overload probabilities using Monte Carlo simulation and optimal power flow calculations. Numerical simulations using a standard power system model show that congestion risk varies with renewable energy forecasts and generator operating conditions and can be reduced by procuring reserves at appropriate locations. The paper also discusses the institutional frameworks, data infrastructure, and computational methods needed to incorporate these findings into reserve procurement and revisions to generator commitment schedules.